Short Lead Time for Water Cooled Condensing Unit - High Temperature Air-Cooled Condensing unit – Cooler
Short Lead Time for Water Cooled Condensing Unit - High Temperature Air-Cooled Condensing unit – Cooler Detail:
Company Profile
Product Description
Spare Parts/Models |
Unit Standard Configuration Table |
|||||||||
Compressor |
4DC-7.2 |
4CC-9.2 |
4VCS-10.2 |
4TCS-12.2 |
4PCS-15.2 |
4NCS-20.2 |
4H-25.2 |
4G-30.2 |
6H-35.2 |
6G-40.2 |
Condenser (cooling Area) |
70㎡√ |
90㎡√ |
100㎡√ |
120㎡√ |
150㎡√ |
200㎡√ |
250㎡√ |
300㎡√ |
350㎡√ |
400㎡√ |
Refrigerant Receiver |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Solenoid valve |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Oil Separator |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
High/Low pressure meter Plate |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Pressure control switch |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Check valve |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Low pressure meter |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
High pressure meter |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Copper Pipes |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Sight Glass |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Filter Drier |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Shock tube |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
√ |
Accumulator |
Optional |
Optional |
Optional |
Optional |
Optional |
Optional |
Optional |
Optional |
Optional |
Optional |
*Noted: Condensing unit without Refrigerant,When the unit is commissioned, the refrigerant is injected by professional technicians
Advantages
◆ The unit equippedwith Bitzer semi-hermetic piston compressor of high quality and stable operation.
◆ Air cooling unit equipped with the external rotor condenser, which is less noise, high efficiency and good appearance.
◆ Air cooling condenser(copper tube and aluminum type) or water cooling condenser (high efficient tube and shell type) is applying to guarantee high heat exchange rate and long life.
◆ A full set of high quality imported or domestic accessories guarantee stable operation.
◆ Water proof junction box is equipped, easy to connect all control components.
Key components
Application
Product Structure
Product detail pictures:
Related Product Guide:
We've been proud with the significant shopper fulfillment and wide acceptance due to our persistent pursuit of top of the range both of those on solution and repair for Short Lead Time for Water Cooled Condensing Unit - High Temperature Air-Cooled Condensing unit – Cooler , The product will supply to all over the world, such as: Cape Town, Jakarta, Ethiopia, Furthermore, all of our products are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our products, please don't hesitate to contact us. We will do our best to meet your needs.
By Chris from UK - 2018.09.21 11:01
Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
By Martina from Guinea - 2018.06.21 17:11