How to Make a Cold Storage?

Cold storage production:

1. Specifications for the installation of the cold storage body
Enter the construction site, check the construction situation according to the construction drawings, and determine the installation location of the equipment (storage body, drainage door, evaporator, main engine, condenser, control system, etc.).

1. floor installation

1.1 Work content
Level the floor first, then start to install the floor, and complete the floor and evaporator drainage system.
1.2 Quality requirements
The floor is installed evenly, and the floor is leveled with materials on uneven parts, and the locking hooks between the boards are locked to achieve a flat warehouse surface without a sense of hollowness. (Note that if the drainage system is installed outdoors in the north, the drainage pipes need to be kept warm).

2. panel installation

2.1 Work content
According to the situation of the site, first select a corner and position it (that is, the vertical board is locked with the floor) to extend to both sides at this corner, only lock the vertical board and the vertical board, and position it when it meets the vertical corner, and place the beautiful board in a conspicuous place When installing to the side of the evaporator, the drain pipe should be prepared in advance, and U-shaped bends and silica gel should be made outside the warehouse.

2.2 Quality requirements
The conspicuous surface of the vertical board is flat, the storage board has no concave points, the top surface of the vertical board is flush, the gap between the vertical boards is even, and the vertical angle at the conspicuous place is flush with the corner of the floor.

3. ceiling mount

3.1 Work content
First select one end to position the corner plate and extend the laying, and lock the top plate and the top plate. When installing, the top plate and the vertical plate are conspicuous at the end to ensure flatness and lock to prevent displacement.

3.2 Quality requirements
The conspicuous part of the ceiling should be beautiful. The joints between the ceiling and the vertical panels should be flush with small gaps, and the ceilings inside the warehouse should be flat.

1 Evaporator Installation Specifications

1.1 Installation content
Open it first, and open it well, the rear wire hole, the rear wire hole, the wire hole, the wire hole to prevent the fast port from being left behind, self-fitting, self-fitting with hidden dangers, self-fitting, self-fitting, self-fitting, hidden dangers and fastness prevention Open the opening and open the vertical plate pre-hole vertically, 250mm, if so, it is the height difference between the intervals between the intervals between the intervals between the intervals between the intervals, the drain pipe, the drain pipe, the drain pipe, the drain Pipe wear, drainage electricity, drainage electricity, drainage electricity, only, only, only parts, refrigeration does not require heating wires, it is the same.

2. Specifications for the installation of the main unit of the cold storage unit
The closer the main unit is to the evaporator, the better. It is easy to maintain and has good heat dissipation. If it is moved outside, a canopy should be installed. Anti-vibration gaskets should be placed at the four corners of the main unit. The installation level is firm and not easy to be touched by people.

All copper pipes need to be wrapped in insulation pipes and wires in the same direction together with air-conditioning cable ties. Try to run straight pipes and fix them in sections. The joints of insulation pipes and insulation pipes should be sealed with electrical tape.

wire discharge:
In addition to being tied with air-conditioning cable ties, all wires must be protected with corrugated hoses or wire-passing grooved pipes. The temperature display wires should not be placed against the wires as far as possible.

Because the condenser and evaporator of the main engine have been pressure-sealed in the factory, there should be pressure when opening the seal, and you can check whether there is any leakage. Dust enters the tube, condenser → host → evaporator, the copper tube is connected by welding, the interface is firm and beautiful